District Fee Schedule

Exhibit A

Platte Canyon Water and Sanitation District

Fee Schedule

(Effective January 1, 2018)

 

Annexation Fees

Annexation fee:    $2,300 per acre or fraction thereof

Administrative / Legal Charge:  $2,000 deposit which is applied to District costs for processing the annexation.  The property owner is required to fully reimburse the District for all administrative and legal costs incurred to process the annexation.  The District will invoice all costs exceeding the deposit and will reimburse any remaining funds upon completion of the project.

 

Fire Hydrant Permit Fees

Hydrant Use Fee:  $100/month/hydrant

In addition to the monthly fee, a $350.00 refundable damage deposit will be collected for each hydrant issued a permit.  If the hydrant is damaged, this deposit will be forfeited and any additional costs will be invoiced.

A numbered fire hydrant use sign will be issued with each hydrant permit. If the sign is not returned to the District, the $350.00 damage deposit will be forfeited.

Denver Water assesses a charge for all water withdrawn from any District owned fire hydrant.

 

Construction Plan Review Fees

Water:                                                       $5.00/lineal foot

Sewer:                                                       $5.00/lineal foot

Minimum Deposit Required:     $2,000

The District will invoice all costs exceeding the deposit and will reimburse any remaining funds upon completion of the project.

 

Construction Inspection Fees

Water:                                                       $5.00/lineal foot

Sewer:                                                       $3.00/lineal foot

Inclination Survey:                                    $4.00/lineal foot

Minimum Deposit Required:     $2,000

The District will invoice all costs exceeding the deposit and will reimburse any remaining funds upon completion of the project.

 

Easement Process Fees

Actual Costs incurred by District to process the easement

Minimum Deposit Required:     $2,000

The District will invoice all costs incurred to process the easement.  Should costs exceed the amount of the deposit, the applicant will be invoiced, and any remaining funds after recording of the easement will be returned to the applicant.

 

Water and Sewer Connection (Tap) Fees

Water Tap Fees

Tap Size

Equiv. ¾" Taps

Tap Fee

 

  ¾"

  1

$    2,900

   1"

  2

$    5,800

1½"

  4

$  11,600

   2"

  8

$  23,200

   3"

18

$  52,200

   4"

36

$140,400

   6"

94

$272,600

 

In addition to the Platte Canyon water tap fee, the Denver Water Department assesses system development charges for all connections made to District facilities.

 

Sewer Tap Fees

Single Family or Equivalent

$1,000

Multiple Family - Per Unit

$1,000

Commercial and Industrial

Water tap size

Equiv. SFREs*

Tap Fee

  ¾"

   2

$   2,000

   1"

4.8

$   4,800

1½"

 11

$ 11,000

   2"

 20

$ 20,000

   3"

 43

$ 43,000

   4"

 86

$ 86,000

       

 

In addition to the Platte Canyon sewer tap fee, the City of Littleton assesses a sewer tap fee for all connections made to District facilities.

* single family residential equivalents

 

Fire Line Tap Processing and Inspection Fee

$500.00

 

License Processing Fee

$1,500

 

Record Retrieval and Copying Charges

Records Retrieval:                  $30.00 per hour after first hour

Copying Charge:                     .25 per standard (8.5” x 11” or 8.5” x 14”) page.  All other copies                                                    charged at actual production cost.